What Is on a Pre-construction Checklist?

Pre-construction Checklist

Even the most basic construction projects can take up to half a year to reach completion. There are almost always unforeseen issues that arise, costing clients time and money.

One way to mitigate this and ensure everything runs as smoothly as possible is by implementing a pre-construction checklist and phase.

Working with a local company is a good way to know everything related to pre-construction has been followed correctly. For example, if you are living in Milwaukee and looking for Milwaukee Spec Curb Cutting Services, make sure to research companies that are prepared for any given situation. 

What is Pre-Construction? 

Pre-construction is all in the name. This is the planning, designing, and analyzing that takes place before actual construction starts. 

These preliminary planning and engineering duties are important to ensure that every detail is thought out and organized. It includes defining the specific project, gathering the resources required for construction from manufacturers such as Dyson Corp, and attempting to identify potential issues in order to mitigate them.

A pre-construction plan gives the construction team a defined outline to follow and it gives the client the overall picture so that they can decide whether it is viable and affordable.

What Happens During Pre-Construction?

The pre-construction process is undertaken by an expert known as a pre-construction manager. This professional will determine a project’s cost, scope, schedule, and all the other finer details. 

These managers will work hard to understand the project in its entirety and create a schedule and strategy to ensure the success of the construction. You can learn more here about hiring professionals to oversee the pre-construction of your project. 

Check out these important pre-construction checklist elements before hitting the construction sites. 

Feasibility of Project 

This is a basic assessment to determine whether a project is feasible. This may depend on the type of construction, the location, and the specifics that a client desires. 

Engineering Assessments 

It is important that an engineering expert assesses the existing condition of the building site. This will be crucial in determining plumbing, electrical, and HVAC feasibility and systems. It is in this step that potential issues will be identified.

Initial Design and Development 

The engineering assessment sets the stage for the initial design and development depending on the results and issues identified. In this step, the client will be presented with drawings and designs in order to get an overview of how the project will turn out. 

See Also

Scope of Roles and Responsibilities 

Once the plan starts to take shape, roles and responsibilities can be assigned. This is the stage that deliverables are discussed between the client and involved professionals. 

Budget Outline 

Once all the above information is collected, it provides the information necessary to create a budget outline. This is important for the client to understand construction project costs based on real information. 

Schedule and Milestones 

Finally, a schedule with important milestones will be created based on all of the information collected in the pre-construction phase. This might be a loose schedule, as unforeseen circumstances may arise. 

Don’t Skip Out on the Pre-Construction Checklist

It’s clear that every step on the pre-construction checklist will help to ensure a smooth and successful project. Rushing through this phase will only result in expensive and time-consuming issues. 

Did you enjoy this post? Our site is packed with construction-related content— keep exploring for more interesting articles!

What's Your Reaction?
Excited
0
Happy
0
In Love
0
Not Sure
0
Silly
0

COPYRIGHT 2022 WHATUTALKINGBOUTWILLIS.COM. ALL RIGHTS RESERVED.

Scroll To Top